Prep School Library Completes Total Energy Efficient Upgrade with Marvin Windows

The Hotchkiss School in Lakeville, CT outfitted its old Edsel Ford library with new Marvin windows in 2009 during an total energy efficient upgrade. The need for a product that was energy efficient and could match the original look of the various windows made Marvin the brand of choice on the Hotchkiss School campus. When comparing old photographs to the newly renovated library building, there is hardly any change in appearance.

Architect: Henry S. Waterbury Architect and Associate at Delano and Aldrich
Supplier: Ed Herrington’s Inc.
Installation Team: Sierra Construction
Renovation Date: 2009
Window Types: Marvin Clad Ultimate Double Hung Magnum, Clad Round Top, Clad Ultimate Double Hung Magnum Transom with Raised Panels, Clad Ultimate Awning, Clad Ultimate Casement with Polygon, Clad Inswing Casements from Marvin Signature Products with Custom Locking Hardware

See more project case studies and videos at awhastings.com/project-profiles

One thought on “Prep School Library Completes Total Energy Efficient Upgrade with Marvin Windows

  1. Pingback: MLuxe – Distinctive Home Style » Blog Archive » Prep school library completes total energy efficient upgrade with Marvin Windows

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s